Example report · fixed fictional data · 15 October 2026
REPORT 09
Repair turnaround and target review
Review the time from repair-center receipt to return and compare it with the sample 14-day target.
Returned repairs40
Mean turnaround h450.0
Over 14-day threshold28
| Turnaround measure | Hours |
|---|---|
| Minimum | 234.0 |
| Median | 450.0 |
| Mean | 450.0 |
| Maximum | 666.0 |
How this is calculated: Turnaround is calculated from receipt to return for 40 completed repairs. The 14-day target is a configurable demonstration assumption, not a regulatory requirement.
Suggested next steps: Review parts availability and repair capacity when investigating repairs beyond target.
What to keep in mind: Total turnaround does not show how much time was spent in the technician queue, on the bench or waiting for suppliers. Those stages need separate timestamps.
© 2026 Mohammed Badawy. All rights reserved.
